Case Study: Offshore Operations

Around-the-clock support across two offshore rigs.

A Singapore and UK-based OEM needed qualified field technicians across two active rigs simultaneously — in Bass Strait and off the West Australian coast. Shifting schedules and weather disruptions demanded rapid mobilisation at short notice.

2

rigs supported simultaneously

24hrs

mobilisation turnaround

2 locations

Bass Strait + West Australia

The Problem
Two rigs. Shifting schedules. Specific ticket requirements.

A Singapore and UK-based OEM required local technical support across two active rigs simultaneously in Bass Strait and off the West Australian coast. Project delays and persistent weather disruptions created continuously shifting schedules, demanding rapid mobilisation at short notice. The end client also required technicians holding specific offshore tickets, adding a further qualification constraint.

The Solution
Around-the-clock roster management across two locations.

We managed our technician roster dynamically, fielding late-night calls, amending travel bookings at short notice and liaising directly with our personnel to ensure qualified, ticket-holding technicians remained continuously available on both rigs throughout the HP Riser installation programme. Every schedule change was absorbed without disruption to the client.

The Results
Both programmes delivered. On time, without interruption.

A successful campaign across both rig schedules. Our around-the-clock availability and ability to absorb and respond to last-minute changes ensured uninterrupted technical support, removing the burden of schedule management from the client and keeping the programme on track from start to finish.

FID

decision supported

Case Study: Advisory & Feasibility

Bespoke and fast-tracked. Where others brought templates.

When a major offshore gas operator needed an independent project risk review to support a critical FID decision, they needed it fast, over the Christmas and New Year period, and to a standard that would hold up to serious investment scrutiny. We delivered.

1

independent reviewer engaged

14 days

delivery turnaround

The Problem
A critical FID review. Over Christmas. At short notice.

The client needed to identify major project execution risks across a significant offshore gas development as a prerequisite to achieving FID. The review was required at short notice, over the Christmas and New Year period, and to a standard to support critical investment decisions.

The Solution
Bespoke from the ground up. No template.

We delivered a bespoke pre-FEED review tailored specifically to the project, its risks, stakeholder structure and decision-making requirements. Rather than applying a generic framework, we designed the review from the ground up to address what the client actually needed to progress confidently to FID.

The Results
Delivered on time. A breath of fresh air.

The review was delivered on time and to the client’s full satisfaction. The work stood clearly apart from what larger engineering firms had proposed, and the client said so. The feedback said everything about the difference between our bespoke approach and the templated processes offered by others.

Case Study: Subsea Engineering

When the market
said no,
we found a way.

A subsea contractor needed to mobilise technicians for offshore installation work in a politically unstable region. Standard insurers declined. Every other tendering contractor walked away. We did not.

1

insurer secured globally

100%

programme completed

1 location

Southeast Asia

The Problem
No insurer would cover the region.

The project required offshore subsea installation work in a politically unstable operating region. Standard insurers declined to provide coverage, leaving the client unable to mobilise their technicians. Without insurance, the campaign could not proceed.

The Solution
We found a way when no one else could.

Drawing on our global network, we secured the specialist insurance coverage required to operate in the region. No other tendering contractor was able to achieve this. With coverage in place, we deployed skilled technicians to deliver the full scope.

The Results
Project completed. Made possible by us alone.

Despite significant client-side delays, we maintained continuity of support throughout, providing highly skilled technicians who kept the programme moving. A project that would otherwise have been delayed was successfully completed, made possible solely by our ability to secure coverage no other contractor could provide.